Civil & Infrastructure Takeoff Automation

Tender drawings in. Traceable bills of quantities out.

Automated highway and bridge takeoff. Ingest vector and scanned drawing sets, allocate by highway chainage, and produce contract-ready Bill 2 and Bill 6 Excel workbooks—where every figure links directly to sheet coordinates.

Zero hallucinated mathDirect Excel export (FIDIC / DOT format)Chainage-by-chainage audit trail
EXP-NH48 • PACKAGE 3B TAKEOFF|CH 14+250 (Box Culvert BR-042)
ACTIVE CONTRACT:
DWG-BR-042-SHT-14.pdfSHEET 14/48
100% CAD AUDIT PASS
FINISHED ROAD LEVEL (+142.850)100mm PCC M10 LEAN BLINDING BEDSPAN: 4,200 mm2,400
Box Culvert Barrel Section [B1]
Linked to Item 6.01 (a)
Spatial Confidence: 99.8%
Station: CH 14+250DWG-BR-042 (Sht 14)

Contract Takeoff (FIDIC Bill 6)

Select line item to inspect drawing bounding box

100% RECONCILED
6.01 (a)48.38 m³

Reinforced Concrete M30 in Box Culvert Barrel & Slabs

DWG-BR-042 (Sht 14)CH 14+250
6.02 (b)3,870.40 kg

High Yield Strength Deformed Bars Fe500D Reinforcement

DWG-BR-042 (Sht 14)CH 14+250
6.03 (c)96.00 m²

Class F2 Formwork to Internal Culvert Faces & Soffits

DWG-BR-042 (Sht 14)CH 14+250
6.04 (a)5.52 m³

Lean Concrete M10 Blinding Layer (100mm Bedding)

DWG-BR-042 (Sht 14)CH 14+250
MATHEMATICAL AUDIT TRAIL6.01 (a)
L × A_net = 12.00m × (4.20m × 2.40m - 3.60m × 1.80m) = 48.38 m³

Deterministic CAD volume extraction verified against sheet geometric coordinates.

The Highway & Bridge Takeoff Pipeline

Built for how estimators and checking engineers actually work.

1

Ingest Multi-Sheet Tender Sets

Upload 100+ page bridge, culvert, drainage, and highway alignment drawings. EdaPro parses vector geometry, titles, scales, and schedules.

2

Allocate by Chainage & Bill

Elements are mapped to specific linear stations (e.g. CH 12+000 to 18+500) and allocated to standard contract bills (Bill 2 Earthwork, Bill 6 Structures).

3

Review Flags & Export Excel

Verify flagged discrepancies, inspect bounding boxes, and export audit-ready Excel workbooks matching FIDIC or state DOT contract standards.

Ready to automate your next tender takeoff?

Join leading civil engineering contractors and checking authorities using EdaPro.ai to bid with confidence.